Енергийна независимост и национална сигурност
Sazliyka river diversion
Diversion of infrastructure sites in the second stage of feasibility study, which is implemented by Minproekt EAD, covers the reconstructions of sites until 2040, and especially correction of bed river Sazlyika.
- Report from studying and analysis of the local biodiversity and assessment of potential impacts of the Sazliyka river diversion by MMI’s project, was created by the Union of Scientists, assigned by “Mini Maritza-iztok” EAD work performed on a contract MTT №444 20.12.2017 for "Мonitoring and inventory system of biodiversity in the area of investment intention of “Mini Maritsa-iztok”EAD and synthesis report analyzing with conclusions, recommendations, and conceptual design to minimize and to offset the impact of the investment plan on the biodiversity" /for Sazliyka bed river/. The report assists to the Performance Requirement №6 (PR№ 6) of EBRD’s ESP: Biodiversity Conservation and Sustainable Management of Living Natural Resources. It has been offered a complete set of measures to be undertaken, including planning and implementation ways to overcome the direct destruction of biodiversity by construction works and the negative consequences of the realization to the investment intention after its implementation.
A few new measures have been identified for biodiversity protection andoffsetting the unavoidable losses.
The third stage covers the period from 2040 to 2050 with the correction of the Sazliyka river bed- 2nd section.